55 cubic meter [diesel tank][1] for drilling site is manufacturing by aipu solids control
[1]: http://www.aipusolidcontrol.com/html/products/oil-tank.html
Drilling Fluid Management & Disposal
Drilling fluid waste management and solids control of drilling mud related technical and developed situation.
55 cubic meter [diesel tank][1] for drilling site is manufacturing by aipu solids control
[1]: http://www.aipusolidcontrol.com/html/products/oil-tank.html
100 sets mud skips for CNNOC had manufactured, tested and delivered by aipu solids control on 13th july.
At this point, the well should be killed. Flow check reveals DPP = 0, CSGP=0.