Vacuum Degasser Design Solves Mud Gas Separation Problems

Vacuum Degasser Design Concept Formulation

The new Vacuum Degasser design was formulated from basic principles used in the chemical processing industry. Standard chemical engineering principles that apply to the design of packed towers were the basis for this new design. These principles deal with efficient phase disengagement to provide’ effective gas absorption or gas strip-ping. Specifically, in the top inlet section of a typical packed tower, the overriding operating principles are effective gas/liquid phase disengagement and uniform inlet liquid distribution over the entire tower cross-sectional area.

Continue reading “Vacuum Degasser Design Solves Mud Gas Separation Problems”

Criticality Testing of Shale Shaker (2)

Drilling operations are highly dependent upon reliable shale shaker to perform efficient drilling operations. Suitable drilling fluid quality, efficient solids removal and low waste production, as well as health, safety and environment (HSE), especially of working environment (WE) in the shaker room, are all respects relevant for selection and skills operation of shale shaker in the oil industry. More :(Criticality Testing of Shale Shaker (1)) and (Criticality testing of shale shaker (3))

Continue reading “Criticality Testing of Shale Shaker (2)”

Criticality Testing of Shale Shaker (1)

Drilling operations are highly dependent upon reliable shale shaker to perform efficient drilling operations. Suitable drilling fluid quality, efficient solids removal and low waste production, as well as health, safety and environment (HSE), especially of working environment (WE) in the shaker room, are all respects relevant for selection and skills operation of shale shaker in the oil industry. Related:(Criticality Testing of Shale Shaker  Part2) and (Criticality Testing of Shale Shaker  Part3)

Continue reading “Criticality Testing of Shale Shaker (1)”